Pembroke North, Wayne, PA

Project Scope of Work:
Spread footings, continuous wall footings, foundation walls, elevated two-way slab

OEP began this project by converting 96 spread footings ranging in size from 7’6” X 7’6” to 14’ X 14’ to grade 80 bar mats. This allowed rapid installation of the footing reinforcement by simply placing chairs and dropping in custom sized sheets at each location. (more…)